Veris Verabar V200S Installation Instructions Manuel d'utilisateur Page 4

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 4
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 3
Figure 6. Orientation of Flow Arrow
The Verabar is now properly installed (Figure 7).
Figure 7. Installed V200 (Single)
Periodic Maintenance
The assembly should be periodically checked. Verify
that no leaks are present. The jam nut and packing bolts
should be tight.
Sensor Removal Procedure
Shut off instrument valves.
Reduce flow rate to below the maximum insertion
withdrawn DP/flow limit stated on the Verabar tag.
Loosen jam nut. Using the drive nut, retract the
sensor until the stop nut and jam nut are pressing
against the threaded bushing.
Completely shut off the access valve. Slowly
crack open one of the Verabar instrument valves
and bleed off any remaining pressure contained in
the access nipple. The sensor assembly can now
be removed.
6315 Monarch Park Place Niwot, CO 80503 USA Phone: (303) 652-8550 IO -200S VWI-CS-023 REV B (6/08)
Fax: (303) 652-8552 Email: contact@veris-inc.com Website: www.veris-inc.com Printed in USA
Vue de la page 3
1 2 3 4

Commentaires sur ces manuels

Pas de commentaire